2013年12月3日星期二

Installation S3300

For the S3352P or S5328C-EI, the methods of installing the SP in a stack and on a single device are the same. In a stack, install the SP on the master switch.
For the S2300, the methods of installing the SP in a stack and on a single device are the same. In a stack, install the SP on each switch.
In the patch delete all command, all is mandatory. On the S3300 or S5300, all indicates the local device. In a stack, all indicates all the devices in the stack. On the S2300, all indicates the single device regardless of whether it is in a stack.
Step 1  Download the patches to the flash memory of the device.
If the device can start, download the SP to the flash memory according to 2.5.1 "Downloading Patches to the Switch Using FTP in Command-Line Interface Mode (Switch Functioning as the FTP Server)."
If the device cannot start, upgrade the device according to the upgrade guide to enable the device to start. Then download the SP to the flash memory according to 2.5.1 "Downloading Patches to the Switch Using FTP in Command-Line Interface Mode (Switch Functioning as the FTP Server)." If the device still cannot start after upgrade, contact Huawei technical support personnel.
Step 2  Load the SP.
<S2326> patch load S23_33_53-V100R005SPH011.pat all
Info: The patch is being loaded. Please wait for a moment.
Info: Succeeded in loading the patch on the master board.............
Step 3  Activate the patches.
<S2326> patch active all
Info: Succeeded in activating the patch on the master board..............
Info: Finished activating the patch.
Step 4  Run the patches.
<S2326> patch run all
Info: Succeeded in running the patch on the master board..............
Info: Finished running the patch.

----End

没有评论:

发表评论