Step 1:
system-view
The system view is displayed.
Step 2:
interface gigabitethernet interface-number
The specified Ethernet interface view is displayed.
Step 3:
mtu mtu
An IPv4 MTU is set for the Etherent interface.
Step 4:
commit
The configuration is committed.
Step 5:
system-view
The system view is displayed.
Step 6:
interface gigabitethernet interface-number
The specified Ethernet interface view is displayed.
Step 7:
ipv6 enable
IPv6 is enabled on the Ethernet interface.
Step 8:
ipv6 mtu mtu
An IPv6 MTU is set for the Ethernet interface.
Step 9:
commit
The configuration is committed.
For more Huawei information please click here
http://www.huanetwork.com/gpon-epon-terminal-price_c42
没有评论:
发表评论